Sunday, January 25, 2009

Ditches, decks and kitchen sinks

Saturday, Jan. 24, was a busy day at the construction site. The Exodus team led by Dan Carey and Mary Ann Gibbons were getting the next to last loads of stuff out of the sanctuary building.



On Monday, or thereabouts, Warren will start stripping the sheathing off the frame of the narthex so it can be tied into the new framing. Steve's crew could begin that as soon as Monday.

Also, Saturday, Steve's crew was out in full force finishing most of the decking.



In addition, Warren and Edgar were installing drain tiles, catch basins and gravel in the drainage ditches dug during the week.

No comments:

Post a Comment

Please let us know if you want to work on this project and when you are available.