Lots of activity at the construction site on Monday:
Golddiggers were installing the anti-siphon valve in the concrete vault dug into the grass between the administration module and the sidewalk.
Steve's crew was getting ready for the final framing-in of the new roof connecting the sanctuary to the clerestory in the front of the building.
The plumbers were working in the main restrooms. The heating contractor was hanging ductwork in the classroom building. Warren was dealing with paperwork.