Once the six-inch main was placed in the trench, it was covered and smaller lines for general water use were placed on top, along with conduits containing the various wires needed to control and protect the valves and meters in and near the street.
Meanwhile, toward the end of the week, the electrician began installing electrical conduits and switch and outlet boxes in the new building. The plumbers began running water lines to the sinks and toilets.