On Tuesday, Warren spent much of his time putting down ceramic tile on the floor of the men's restroom. These tiles were about a foot square. Other tiles that will go on the wall are about an inch square. Others, even smaller and multi-colored will be used for decorative borders. In the women's restroom, a vinyl backsplash was installed on one wall.
Meanwhile, outside, Coles sanded and stained the two big beams that will hold up the translucent entrance awning and the cross beams that directly support it. Inside, the new "beams" at the back of the sanctuary were stained so that blended better with the color of the original beams.
Also, interior doors and door frames were delivered. They'll be installed soon.
Larry, Paul and Sue are spending hours on the watering each day trying to keep the lawn and the new landscape plantings alive during the heat wave.