Sue got the call Thursday morning to run over to the church construction site where the crew was pouring, tamping, rolling and burning a smooth, solid transition from the new concrete plaza in front of the church to the old blacktop driveway. Her photos show the crew doing a fine job and doing it quickly.
Says Sue:
I almost missed them. The asphalt was already in place but they were still smoothing it, making a clean edge and sealing it. ...
You should have seen all the equipment they had on site just for that little strip; a large truck that was pulling a trailer with a large piece of equipment (probably used to pick up the old asphalt), the truck with the new asphalt, a truck with a trailer that transported the small 'steam' roller, a bright red truck that probably belonged to the man in charge.
It was interesting to watch the men work and clean up after they were finished.
Meanwhile, Carlos is doing a great job of building the new fence for the preschool playyard.
The kitchen is taking shape and you can imagine it filled with counters, cabinets and appliances, and lots of mouthwatering scents. The fire alarm pull has been installed right next to the back door light switches. Hope that's not a problem. Turning on the fan over the range opens a big vent in an outside wall.
Toilet bowls and other parts filled two pallets in the staging area and some were already distributed to restrooms around the building, but none had been installed yet.
Warren, Coles and Bob J. were putting in new door handles all over the place.
Painting has been completed for the most part in the offices, restrooms and classrooms, but the main fellowship area, the sanctuary, the kitchen and some storage areas still need to be finished.
No comments:
Post a Comment
Please let us know if you want to work on this project and when you are available.