The construction site was quiet on Saturday afternoon, but it sure has been a busy week. Many of the interior walls are up. It's much easier to see where various rooms are going to be in the new layout. In the photos below, I've tried to indicate those locations, although occasionally I had to guess at the exact placement of walls.
Also, all the drywall has been stripped from inside the narthex. Quite a mess. The carpet still needs to be pulled up. The wall where we come in will be removed. The back wall of the sanctuary will be moved back to the middle of the big window in the narthex. That's about even with the old wall between Steve's office and Rena's.