Wednesday, December 3, 2008

"Unbelievably romantic"

That's the way Warren describes the opportunity he has for you to help.

He needs to get old pipes, wires, wood and other debris out from under the Bruce Hall floor before concrete pouring begins, probably Monday. There's a lot more light under the floor now, he says, since the north wall has been removed below floor level.

(Warren is such a kidder.)

On Wednesday, all the concrete was ripped up and hauled away. As was the stump between the pre-school building and Bruce Hall.

Thursday, excavation begins. Among other things, they'll be digging a 4-foot deep trench in front of the church and the main door to the sanctuary building. If you want in, bring your ladder. Or go around to the door on the east side.

Both the concrete contractor and a city inspector will look things over on Friday. Prayers are in order, as always.

Click on COMMENTS below to let Warren know if and when you'll be able to help - or if you just have something to say.

No comments:

Post a Comment

Please let us know if you want to work on this project and when you are available.