Ramping up -- and down, too, of course

As both Warren and Steve warned us, the honeymoon is nearly over. The progress from now on will be in the details. Much won't be visible from the outside or even inside unless you look closely.

The ramp to the classroom building from the main fellowship area nearly is finished. The steps have been completed.

No more big ditch: it is all filled in now, although to find and fix the intermittent phone line problems that developed Wednesday, the crew may need to dig around a bit. Larry got the pre-school fence back up and some new play chips down Tuesday afternoon.

Most of the plumbing that we'll never see when the drywall goes on has been installed, both drain lines and hot and cold water lines. No faucets or fixtures yet.

The locations for the electrical outlets and switches have been decided. Most of the boxes have been attached to the framing. Conduits are being pulled: silver snakes all over the place.

The framing for the new back wall of the sanctuary is in place, and the old back wall is ready to come down. Larry may work on that today.