Monday, July 20, 2009

On the right path

Last week, lots of dirt got moved one wheelbarrow full at a time as 14 yards of topsoil were placed around the construction site. It's a sign that the outside work is almost finished. Thanks to Larry and Paul the grounds are as clean as they have been in months. In the process, they replanted several shrubs that had been disrupted by the construction work but which are, amazingly, still blooming.

They used some extra gravel to recreate a path from the entry way around to the rose garden and beyond to the side door to the sanctuary.

Inside, progress is subtle. The restrooms are nearly ready for tile. Work is under way to clean, sand and level the preschool rooms' floors for installation of vinyl flooring.

And the watering crew is keeping the grass and the new plantings alive.

No comments:

Post a Comment

Please let us know if you want to work on this project and when you are available.