Tuesday, July 7, 2009

Sidewalk superintendents

On Tuesday, Warren and crew were halfway through pouring new porches and sidewalks around the building. Forms had been removed from some of the porches and were ready to be removed from about half the sidewalks so new forms could be built for pouring the second half of the concrete.

Rebar was in place for building some steps down into the utility basement.

Larry and Paul were working on a bit of carpentry in the eaves where the old building and the new building meet. Some carefully measured and cut tongue and groove lumber was being fitted under the roof to plug a ragged little hole.

Inside, some canny carpenters have hoisted what appears to be another beam up under the roof at the back of the sanctuary, so that the beams in the front and back match in size. It turns out to be a little trompe l'fir -- a box made of a 2x6 and two 2x8s. But with putty and paint, who'll know?

Elsewhere, mudding and sanding of the drywall continues and electrical work -- especially for the fire alarm system -- goes on.

And some grungy-looking guy claimed to be giving the grass a one-month dose of fertilizer, but he mainly seemed to be wandering about on the new lawn.