Tuesday, August 4, 2009

Glazing over in the sanctuary

Some of the crossbeams went up for the entryway awning over the weekend. Several more still need to be raised, and some that are up need to be fully screwed down. Nonetheless, it is a very visible sign of progress.

Less visibly, on Monday Bill replaced the eight old cracked panes of glass in the hidden side windows behind the altar with new, clear glass. That finishes the glazing work in the sanctuary.

Most, but not all, of the interior doors are installed now. Many of them have been trimmed out with preprimed 1" by 4" (more or less) boards, which are ready to be prepped for painting.

Meanwhile, Warren continues laboring away on the tilework in the men's and women's restrooms. The work looks terrific.