These are miscellaneous things that have happened early in the week.

The toilets were delivered. The sealing of the kitchen drywalling is done.

The bathrooms were unwrapped after painting. You can now see the difference in the decorative tile used in the men's and women's rooms.

The access to the crawlspace under the classrooms by the back door was finished with a door and box (and there's that dog again!).

The lamppost -- pipe -- that held up our security light was cut off its base.

A cage (city calls it a safety platform) was built around the exhaust system for the stove fan.

Warren had floated a sort of light cement on the hallway and kitchen subfloors to level them in preparation for flooring.