Saturday, August 15, 2009

Painting prep


Painters spent the week ending Friday, August 14, getting ready to paint. Everything that was going to be painted next week was covered or wrapped or taped. There was still some sanding going on.

Meanwhile, the Emmanuel crew had been been busy.

Temporary hollow-core doors replaced raggedy sheets of plywood at the main entrance. Counters for the sinks were built and installed in the restrooms. All the remaining dirt areas that are supposed to be grass in the landscape plan were hydroseeded. There were big areas right in front of the building, along the north side that needed it and smaller areas at the south door of the education wing, near the mobiles, near the shed and around the edges of the new grass. As a result, the city approved the landscape permit.

The new door to the utility basement was finished, gravel was placed around the outside wall in places to keep dirt from touching the siding, and a French drain for the playyard was finished.

In the kitchen, the fire suppression kit and a stainless steel back splash were added to the range hood.

No comments:

Post a Comment

Please let us know if you want to work on this project and when you are available.