Wednesday, September 23, 2009

Things are heating up


It's getting really close to our first service in the new building this Sunday. There's still a lot of work to be done to get ready.

It would really help to have a crew at the church at 10 a.m. on Saturday to move chairs into the sanctuary. It will take about six of us to get it done: three to get the chairs down from the attic (it's very cramped up there) and three to move them and set them up in the sanctuary.

Sydney would also like the crew to bring down the Sunday School boxes that were moved to the attic last fall.

Then, you can go give blood at Kendra Davison's blood drive in the fellowship area.

There will also be a lot of general clean up to do around the building between now and Sunday morning.

Although a lot of light fixtures have been hung, including some in the sanctuary, there are still several to be put up in there.

On Wednesday, the painter was back doing touch up and finishing the trim on the kitchen pass-through, on the frame and trim for the main doors and on the front wall around the main doors.

Warren was making sure toilet paper holders were installed in the bathrooms, among several other things.

And Larry was up on the roof cleaning the gunk off the outside of the clerestory windows. Paul was spotting him from the grassy knoll outside Pastor Steve's office. Should Larry be so unlucky as to fall off the roof, Paul said, he was prepared to give Larry a good hard shove before he hit the ground. Paul seemed convinced that would be a good thing to do. Don't know Larry's thoughts on the matter.

No comments:

Post a Comment

Please let us know if you want to work on this project and when you are available.