Wednesday, September 2, 2009

Somewhere to sit



Sue took these photos and gives us this report from Tuesday at the construction site:
Warren [was] sponging and putting the leveling stuff on the floor near the entry. ... Since he is now working in the main area of the building he has to do it after everyone else has gone for the day. He was up there until after 9 p.m. Tuesday night.

This group of pictures includes ... the toilets and wash basins in the Ladies room and the tile laying on the counter waiting to be installed. Then the plumber working in the men's' room, the kitchen soon after it was painted, ... the painters up on scaffolding doing some touchup painting in the clerestory and also staining the beams as they move along.

The last picture is of Larry and Paul working on the entry to the utility room; putting in a ladder to specifications: just the right number of degree slope, no impediments to fast entrance, etc. Also, both access lids have been painted to match the lower color of the siding.

Right now it's getting down to it being all in the details. Lots of little things to think about, be sure they are included and right.

1 comment:

  1. Just to make clear to everyone--these are NOT the seats that you just bought in the "Take a Seat" campaign!!

    Phyllis

    ReplyDelete

Please let us know if you want to work on this project and when you are available.